Step 3: Install Galvanized Steel Columns
After attaching these steel columns to the base and attaching to the supplemental beam, the SmartJack system is ready to adjust and lift, raising the sloping crawl space beams above back to level.
Step Two: Fill and Add Cast Aluminum Footing
After adding our engineered fill, we built our cast aluminum footing.
Step One: Excavate
A 2x2x2 hole is excavated for the SmartJack engineered fill.
