Before Installation - Separating, Sagging Floors
This kitchen had the floor and walls separating a bit due to the sagging floors.
Before Installation - Weakened Crawl Space
Putting liner beneath the floor joists can often trap moisture there, weakening floor joists and causing sagging floors.
During Installation - Checking Our Work
After ensuring our SmartJacks are perfectly level, our foreman and his installation specialist will also mark the SmartJacks so in future maintenance visits, we can see if any shifting has occurred since installation.
After Installation - SmartJack System
Our SmartJack system, installed on our engineered fill, immediately lifted these sagging, sloping floors and eliminated threat of flor failure from moisture, mold or wood rot.
